Auswide Plumbing have been engaged by Comdain Infrastructure to assist in the completion of a new pump station at Lovely Banks for Barwon Water.

The project involved extending the Melbourne to Geelong Pipeline from Lovely Banks to Montpellier in Geelong to service more customers in the area.

Auswide Plumbing installed 660mm and 711mm Sintakote MSCL pipe and provisions for new electrical services at the pump station site in Lovely Banks and also assisted with civil works at the Montpellier site which included 100 metres of 660 MSCL tying into the 1124mm Lovely Banks feeder main.

The new pump station increased the rate of delivery from 7 GL/year to 16 GL/year, which is approximately 50 per cent of the Greater Geelong region’s annual water demand.